Skip to content Skip to footer

Installed capacity :  2 X 63 MW
Design energy        :  515 MU
Project cost             :  Nu. 12.52 billion
Incorporation          :  May 13, 2008
COD                             :  February 2015
Shareholder             :  DGPC (59%), Tata Power (26%), NPPF (15%)

Contact