Installed capacity    :  4 X 150 MW
Design energy            :  2,568.88 MU
Project cost                :  Nu. 70 billion
Incorporation            :  June 12, 2015
Project schedule     :  Sept 2015 – 2029
Shareholders            :  DGPC (60%), Tata Power (40%)