With the completion of dam, headrace tunnel, and powerhouse, the impounding of the dam at the 118 MW Nikachhu hydropower project was carried out today.
![](https://www.drukgreen.bt/wp-content/uploads/2023/11/Impoundment-of-Nikachhu-dam-2.png)
With the completion of dam, headrace tunnel, and powerhouse, the impounding of the dam at the 118 MW Nikachhu hydropower project was carried out today.