Business scope: To construct and commission small hydro projects up to 150 MW
Shareholding: DGPC (100%)
Installed generation capacity: 4x180 MW
Design energy: 2,925.25 GWh
Project scheme: Run-of-the-river
Business scope: Manufacture of automation systems for hydropower plants
Shareholding: DGPC (51%), Andritz Hydro, India (49%)
Installed generation capacity: 4x150 MW
Design energy: 2,568.88 GWh
Project schedule: SEP 2015 – 2029
Shareholding: DGPC (60%), Tata Power, India (40%)
Installed generation capacity: 2x59 MW
Design energy: 419.52 GWh
Commercial operation: JAN 2024
Shareholding: DGPC (100%)
Business scope: State-of-the-art repair and manufacturing of hydro turbine runners and associated components
Commercial operation: 30 SEP 2014
Shareholding: DGPC (100%)
Installed generation capacity: 2x63 MW
Design energy: 515 GWh
Commercial operation: FEB 2015
Shareholding: DGPC (59%), Tata Power, India (26%), NPPF (15%)
Business scope: Promote, develop and manage renewable energy projects, particularly hydropower, in an efficient, responsible and sustainable manner, and to maximise wealth and revenues to the nation
Installed generation capacity: 6x170 MW
Design energy: 3,962 GWh
Project scheme: Run-of-the-river
Installed generation capacity: 2x12 MW (+) 2x20 MW
Design energy: 291 GWh
Project scheme: Run-of-the-river
Installed generation capacity: 4x15 MW
Design energy: 400 GWh
Project scheme: Run-of-the-river
Installed generation capacity: 4x84 MW
Design energy: 1,800 GWh
Project scheme: Run-of-the-river